Skip to content
Ελληνικά
English
Main Page
Company
Activity Fields
Air Pollution
Acoustic Environment
Waste Management
Safety Management and Risk Analysis
Natural Resources Management
Climate Change
Environmental Impact Assessment
Environmental Management
Environmental Legislation
Environmental Policy and Strategic Plans
Projects
Clients
Contact us
Navigation Menu
Navigation Menu
Main Page
Company
Activity Fields
Air Pollution
Acoustic Environment
Waste Management
Safety Management and Risk Analysis
Natural Resources Management
Climate Change
Environmental Impact Assessment
Environmental Management
Environmental Legislation
Environmental Policy and Strategic Plans
Projects
Clients
Contact us
Ελληνικά
English
PROJECTS
Environmental Policy and Strategic Plans
Regional Climate Change Adaptation Plan (RCCAP) of the Peloponnese Region and Strategic Envirοnmental Impact Assessment, 2019-2020.
NanoEXPLORE: Integrated Approach for Exposure and Health Effects Monitoring of Engineered Nanomaterials in Workplaces and Urban Areas, LIFE17 ENV/GR/000285, 2018-2022.
Air Pollutant Emission Inventories and Informative Reports in Implementation of Directive 2016/2284 / EU (NEC) and the LRTAP Convention, , NTUA, MEEN, 2017, 2018, 2020.
Air Pollutant Emission Inventories, Informative Inventory Reports and the National Programme for Air Pollution Control in Implementation of Directive 2016/2284 / EU (NEC) and the LRTAP Convention, NCESD, (Ministry of the Environment and Energy), 2019-2020.
Regional Climate Change Adaptation Plan (RCCAP) of the North Aegean’s Region and Strategic Envirοnmental Impact Assessment, Region of North Aegean, 2018-2019.
National Calibration Laboratory for the Certification of the Reliability of Atmospheric Pollution Measurements, MEECC, 2012-2015
Implementation of Greenhouse Gases National Inventory in the framework of the Kyoto Protocol, MEECC-NTUA, 2008-2013
Investigation of the Road Traffic Emissions Contribution to Air Pollution in Urban Areas in order to propose and specify reliable policies, MEECC, 2012
Development of A Cost Efficient Policy Tool for reduction of Particulate Matter in AIR (ACEPT-AIR LIFE 09 ENV/GR/000289), LIFE PROGRAMME, 2010-2014
Assessment study of CO2 emissions of Hellenic Petroleum S.A. in Elefsis - Attica, Greece, HELPE SA, 2010
Strategic Plan for confronting Climate Changes in Athens, Municipality of Athens, 2010
Noise Abatement Programme for the North Road Corridor of Crete: Measurements, evaluation and abatement measures, 2008
Industrial Risk – Urban and Spatial Planning, Organisation for planning and environmental protection of Thessaloniki, 2007-2008.
Implementation of a long-term Strategic Plan of Development in the area of Larissa County 2005-2020. Institute of Regional Development of the Panteion University, 2006.
Water Management of the Stymfalia Lake Ecosystem, General Secretariat of the Peloponnese Region, 2005-2006
Implementation of a long-term Strategic Plan of Development in the area of Larissa County 2005-2020. Institute of Regional Development of the Panteion University, 2006.
Development of an Action Plan for the abatement of Atmospheric Pollution a) Mytilini, Lesvos, b) Ioannina, c) Kavala and d) Patras, Ministry of the Environment, Planning and Public Works, 2004-2005.
Integrated Actions for the Information and Awareness of Public in order to Confront Technological Accidents of Large Extent”, Ministry of the Environment, Planning and Public Works, 2003-2005.
Green Drachma: An Innovative Approach for Waste Recycling and Environmental Public Awareness, Programme: LIFE, 1999-2001
Advanced Techniques for Environmental Measurements and Forecasts, General Secretariat of Research and Technology, 2003-2006
1
2
Next »
Environmental Legislation
Air Pollutant Emission Inventories and Informative Reports in Implementation of Directive 2016/2284 / EU (NEC) and the LRTAP Convention, , NTUA, MEEN, 2017, 2018, 2020.
Support Actions and Inventory of Greenhouse Gases according to European and International Conventions, NTUA, Ministry of Environment and Energy (MEEN), 2009-2016, 2018-2020.
Air Pollutant Emission Inventories, Informative Inventory Reports and the National Programme for Air Pollution Control in Implementation of Directive 2016/2284 / EU (NEC) and the LRTAP Convention, NCESD, (Ministry of the Environment and Energy), 2019-2020.
Greenhouse Gases Emission Inventories in the Framework of the European Legislation and the International Conventions, Ministry of the Environment and Energy (ΜΕΕΝ), 2017.
National Calibration Laboratory for the Certification of the Reliability of Atmospheric Pollution Measurements, MEECC, 2012-2015
Investigation of the Road Traffic Emissions Contribution to Air Pollution in Urban Areas in order to propose and specify reliable policies, MEECC, 2012
Development of A Cost Efficient Policy Tool for reduction of Particulate Matter in AIR (ACEPT-AIR LIFE 09 ENV/GR/000289), LIFE PROGRAMME, 2010-2014
Industrial Risk – Urban and Spatial Planning, Organisation for planning and environmental protection of Thessaloniki, 2007-2008.
Water Management of the Stymfalia Lake Ecosystem, General Secretariat of the Peloponnese Region, 2005-2006
Development of an Action Plan for the abatement of Atmospheric Pollution in the Greater Thessaloniki Area, Ministry of the Environment, Planning and Public Works, 2003-2004
Photochemical Modelling within AutoOil II, Programme, AOPII, Funded by JRC- ISPRA, 1997-99
Environmental Management
Implementation of an Action Plan for the elimination of PM10 concentration exceedances in Thessaloniki, Greece, 2021-2022
Mining Closure Planning, Implementation of Restoration Studies and Geospatial Management of the Public Power Company (PPC) Surface Lignite Mines, PPC, 2020-2021.
Air Pollutant Emission Inventories and Informative Reports in Implementation of Directive 2016/2284 / EU (NEC) and the LRTAP Convention, , NTUA, MEEN, 2017, 2018, 2020.
Air Pollutant Emission Inventories, Informative Inventory Reports and the National Programme for Air Pollution Control in Implementation of Directive 2016/2284 / EU (NEC) and the LRTAP Convention, NCESD, (Ministry of the Environment and Energy), 2019-2020.
National Calibration Laboratory for the Certification of the Reliability of Atmospheric Pollution Measurements, MEECC, 2012-2015
Monitoring air quality in the area of the installations of Hellenic Petroleum S.A. in Attica, Greece, HELPE SA, 2010-2013.
Monitoring air quality in the area of the installations of the Organization of Piraeus Port, in Attica, Greece, 2010-2013.
Consultant to the Mount Athos Community for the planning, permitting and installation of Photovoltaic systems, 2011-2013.
Implementation of Greenhouse Gases National Inventory in the framework of the Kyoto Protocol, MEECC-NTUA, 2008-2013
Investigation of the Road Traffic Emissions Contribution to Air Pollution in Urban Areas in order to propose and specify reliable policies, MEECC, 2012
Development of A Cost Efficient Policy Tool for reduction of Particulate Matter in AIR (ACEPT-AIR LIFE 09 ENV/GR/000289), LIFE PROGRAMME, 2010-2014
Technical Consultant to the Ministry of the Environment for the North Road Corridor of Crete, Greece, Ministry of the Environment, Planning and Public Works, 2007-2012
Assessment study of CO2 emissions of Hellenic Petroleum S.A. in Elefsis - Attica, Greece, HELPE SA, 2010
Strategic Plan for confronting Climate Changes in Athens, Municipality of Athens, 2010
Preparation of a Measurement Plan in the area of the HELLENIC OIL Facilities of Elefsina, ELLPE SA 2008.
Noise Abatement Programme for the North Road Corridor of Crete: Measurements, evaluation and abatement measures, 2008
Industrial Risk – Urban and Spatial Planning, Organisation for planning and environmental protection of Thessaloniki, 2007-2008.
Implementation of a long-term Strategic Plan of Development in the area of Larissa County 2005-2020. Institute of Regional Development of the Panteion University, 2006.
Water Management of the Stymfalia Lake Ecosystem, General Secretariat of the Peloponnese Region, 2005-2006
Implementation of a long-term Strategic Plan of Development in the area of Larissa County 2005-2020. Institute of Regional Development of the Panteion University, 2006.
1
2
Next »
Air Pollution
LIFE SIRIUS
Implementation of an Action Plan for the elimination of PM10 concentration exceedances in Thessaloniki, Greece, 2021-2022
The Impact of COVID-19 Restriction Measures on Air Pollution and Climate Change in Attica, NECCA (former NCESD), 2020.
Environmental Impact Assessment and Air Pollution Dispersion Study for the Steam Electric Station (SES) of Meliti, Lignitiki Melitis S.A., 2020.
Air Pollutant Dispersion Study of the Port of Piraeus, OLP S.A., 2019-2020.
Air Pollutant Dispersion Study of the Thriasio Plain Freight Station, Samaras & Partners, 2020.
Air Pollutant Dispersion Study of the installation of TITAN’s S.A. Plant in Kamari, 2019.
Optimization of the Atmospheric Pollution Monitoring System and Air Pollutant Dispersion Study of the Aegean Motorway, Aegean Motorway S.A., 2019.
Environmental Impact Assessment and Air Pollutant Dispersion Study of the Steam Electric Station (SES) of Meliti, Public Power Company (PPC) , 2018-2019.
NanoMONITOR: Development of a Real-Time Information and Monitoring System to Support the Risk Assessment of Nanomaterials Under REACH, LIFE14 ENV/ES/000662, 2016-2018.
NanoEXPLORE: Integrated Approach for Exposure and Health Effects Monitoring of Engineered Nanomaterials in Workplaces and Urban Areas, LIFE17 ENV/GR/000285, 2018-2022.
Air Pollutant Emission Inventories and Informative Reports in Implementation of Directive 2016/2284 / EU (NEC) and the LRTAP Convention, , NTUA, MEEN, 2017, 2018, 2020.
Air Pollutant Emission Inventories, Informative Inventory Reports and the National Programme for Air Pollution Control in Implementation of Directive 2016/2284 / EU (NEC) and the LRTAP Convention, NCESD, (Ministry of the Environment and Energy), 2019-2020.
Optimization of the Monitoring System for the Quality of the Atmospheric and Acoustic Environment in the fourteen (14) FRAPORT Airports, FRAPORT, NTUA, 2017.
Mapping οf Atmospheric Pollution in Greece. Implementation of Air Pollutants Measurements and Chemical Analyses, Development of Emission Inventories and Application of 3-D Atmospheric Models, Ministry of Environment and Energy (MEEN), 2014-2015.
National Calibration Laboratory for the Certification of the Reliability of Atmospheric Pollution Measurements, MEECC, 2012-2015
PARTHENO2N- Atmospheric Pollution in the Greater Area of Athens: Satellite Observations of NO2 and comparison to Earth and Telescopic Measurements and Model Simulations, PARTHENO2N, Academy of Athens, EU project, 2013.
Monitoring air quality in the area of the installations of Hellenic Petroleum S.A. in Attica, Greece, HELPE SA, 2010-2013.
Monitoring air quality in the area of the installations of the Organization of Piraeus Port, in Attica, Greece, 2010-2013.
Implementation of Greenhouse Gases National Inventory in the framework of the Kyoto Protocol, MEECC-NTUA, 2008-2013
1
2
Next »
Climate Change
The Impact of COVID-19 Restriction Measures on Air Pollution and Climate Change in Attica, NECCA (former NCESD), 2020.
Regional Climate Change Adaptation Plan (RCCAP) of the Peloponnese Region and Strategic Envirοnmental Impact Assessment, 2019-2020.
Regional Climate Change Adaptation Plan (RCCAP) of the Crete Region, 2020-2021.
Climate Change in the Beginning of the 19th Century and its Consequences on the War of Greece Independence, Academy of Athens, 2019-2022.
Regional Climate Change Adaptation Plan (RCCAP) of the North Aegean’s Region and Strategic Envirοnmental Impact Assessment, Region of North Aegean, 2018-2019.
Greenhouse Gases Emission Inventories in the Framework of the European Legislation and the International Conventions, Ministry of the Environment and Energy (ΜΕΕΝ), 2017.
Impact of Climate Change on Tourist Development of Environmentally Sensitive Areas of Greece: Pilot application Messinia Area of Integrated Tourist Development, Academy of Athens, EU project, 2013-2014.
CIRCE: Climate Change and Impact Research: the Mediterranean Environment, EU project, 2014.
Global Trends in Stratospheric Ozone and Temperature, Mariolopoulio-Kanaginio Institute of Environmental Sciences, 2012-2013.
Implementation of Greenhouse Gases National Inventory in the framework of the Kyoto Protocol, MEECC-NTUA, 2008-2013
Assessment study of CO2 emissions of Hellenic Petroleum S.A. in Elefsis - Attica, Greece, HELPE SA, 2010
Strategic Plan for confronting Climate Changes in Athens, Municipality of Athens, 2010
Environmental Impact Assessment
Amendment of the Environmental Impact Assessment of the Lignite Mines of PPC in Amyntaion and Lakkia and update of the Waste Management Plan, Public Power Corporation,2021-2022
Environmental Impact Assessment of a 432,6 Mwp Photovoltaic Power Station, located at the position of “Kokartza”, Municipality of Kilkis, VSpring Ltd, 2021-2022
Environmental Impact Assessment of a 100 Mwp Photovoltaic Power Station, located at the position of “Pente Adelfia”, Municipality of Deskati, Grevena, JUWI HELLAS ENERGY S.A. , 2021-2022.
Environmental Impact Assessment of a 84,81 Mwp Photovoltaic Power Station, located at the position of “Palaiotourko”, Municipality of Deskati, Grevena, VSpring Ltd, 2021
Strategic Environmental Impact Study for the Implementation of the Nafplio Port Development Framework (PEAL), Nafplio Port Fund, 2021.
Environmental Impact Assessment and Air Pollution Dispersion Study for the Steam Electric Station (SES) of Meliti, Lignitiki Melitis S.A., 2020.
Environmental Impact Assessment and Air Pollutant Dispersion Study of the Steam Electric Station (SES) of Meliti, Public Power Company (PPC) , 2018-2019.
Environmental Impact Assessment of a 92 MW Photovoltaic Station, located at “Zavorda Monastery”, Municipality of Deskati, Grevena, VSpring Ltd, 2020-2021.
Renewal and Amendment of the Environmental Terms of the Manufacturing Industry of PET Bottles and Bottling - Encystment of Juices and Soft Drinks in Schimatari, Viotia, COCA COLA S.A. 2020.
Environmental Impact Assessment of the Igoumenitsa Marina, 2018.
Hydrogeological and Environmental Studies of the Public Power Company (PPC) Lignite Mines, 2018-2019.
Renewal and Amendment of the Environmental Terms for the Completion of Construction and the Operation of the PATHE Motorway’s Subsection "SKARFIA-THERMOPYLES", Department "SKARFIA-LAMIA-RACHES", 2015-2017.
Environmental Impact Assessment of the Katakolon port, Decentralised Administration of Peloponnese, 2013.
Environmental Impact Assessment of the Filatrinos Dam and the Irrigation Network of Filatrinos, Ministry of Food and Agricultural Development, 2012-2013.
Environmental Impact Assessment from the Operation of Lignite Mines of PPC in Amyntaion and Lakkia Public Power Corporation, 2013.
Consultant to the Mount Athos Community for the planning, permitting and installation of Photovoltaic systems, 2011-2013.
Technical Consultant to the Ministry of the Environment for the North Road Corridor of Crete, Greece, Ministry of the Environment, Planning and Public Works, 2007-2012
Environmental Impact Study from the Construction and Operation of the Elefsis Industrial Area, 2011
Environmental Impact Study from the construction and operation of the Natural Gas Power Plant HERON V, 1160 MW, in North Evoia, HERON V Power Plant SA, 2011-2012.
Environmental Impact Assessment from the Construction and Operation of the Industrial Area of North Evoia, GEK SA, 2010-2011.
1
2
Next »
Safety Management and Risk Analysis
Emergency Operations Plan to Confront Large-Scale Technological Accidents in the Region of Elefsina, 2021-2022
Municipality of Aspropyrgos’ Operational Organization for Civil Protection and Response to Natural and Technological Disasters, Information and Education of the Public, Municipality of Aspropyrgos, 2020-2021.
Implementation of the Action Plan to Confront Technological Accidents of Large Extent Attica, Region of Attica, 2019-2020.
Action Plan to Confront Large Scale Technological Accidents in the Region of Attica, Regional Government of Attica, 2015-2016.
Safety Management and Risk Assessment for the Area of Integrated Tourist Development NAVARINO DUNES (COSTA NAVARINO) in Pylos, 2008-2009.
Industrial Risk – Urban and Spatial Planning, Organisation for planning and environmental protection of Thessaloniki, 2007-2008.
Integrated Actions for the Information and Awareness of Public in order to Confront Technological Accidents of Large Extent”, Ministry of the Environment, Planning and Public Works, 2003-2005.
Risk assessment study and Safety Management System and Study of the Domino Effect for the Installations of Fuel and Chemicals of the Company LIMNOS OIL SA, 2002.
Safety Management Study for the installations of the Industry of Phosphoric Fertilizers in Thessaloniki and Nea Karvali, IPF SA 2001.
Implementation of an Action Plan to Confronting Technological Accidents of Large Extent in the Greater Area of Piraeus, Prefecture of Piraeus, 1999-2001.
Implementation of an Action Plan to Confronting Technological Accidents of Large Extent in the Greater Thessaloniki Area, Prefecture of Thessaloniki, 1998-2000.
Risk assessment study and Safety Management System and Study of the Domino Effect for the Installations of Fuel and Chemicals of the Company CHYMA SA, 2000.
Assessment of Environmental Risks from the Operation of Industries coming under the SEVEZO Directive, MEECC, 1998.
Acoustic Environment
Optimization of the Atmospheric Pollution Monitoring System and Air Pollutant Dispersion Study of the Aegean Motorway, Aegean Motorway S.A., 2019.
Optimization of the Monitoring System for the Quality of the Atmospheric and Acoustic Environment in the fourteen (14) FRAPORT Airports, FRAPORT, NTUA, 2017.
Implementation of a Noise Monitoring Programme and Noise Maps in the area of Piraeus Port, 2012-2013
Technical Consultant to the Ministry of the Environment for the North Road Corridor of Crete, Greece, Ministry of the Environment, Planning and Public Works, 2007-2012
Noise Abatement Programme for the North Road Corridor of Crete: Measurements, evaluation and abatement measures, 2008
Natural Resources Management
Mining Closure Planning, Implementation of Restoration Studies and Geospatial Management of the Public Power Company (PPC) Surface Lignite Mines, PPC, 2020-2021.
Hydrogeological and Environmental Studies of the Public Power Company (PPC) Lignite Mines, 2018-2019.
Hydrogeological and Environmental Studies of the Public Power Company (PPC) Lignite Mines, 2015-2017.
Water Management of the Stymfalia Lake Ecosystem, General Secretariat of the Peloponnese Region, 2005-2006
Ecotourism Development Study in the area of Pinios Delta, Prefecture of Larissa, 2003-2004.
Waste Management
Waste Management Plan from the Lignite Mines of Public Power Corporation in Amyntaion and in Lakkia, PPC SA, 2013.
Waste Management Plan from the Industrial Installations of PAPADOPOULOU SA, PAPADOPOULOU SA, 2012.
Green Drachma: An Innovative Approach for Waste Recycling and Environmental Public Awareness, Programme: LIFE, 1999-2001
Green Drachma II: Promoting Sustainable Development in Halkidiki, Greece, through the use of Coordinated Pilot Actions and the Application of Integrated Product Policy Tools: Environmental Benchmarking in Hotels, Agriculture and Food Enterprises, LIFE ENVIRONMENT, 2004-2006.